|
Weather and Fault Statistics for Semester 94A
Introduction
The following tables present the weather loss and fault loss for semester 94A. Full details are stored on database at the JAC and interested readers are referred there for further information.
Graeme Watt, ROE
Iain Coulson, JAC
Month Avail Extend Primary % Backup %
Hrs Hrs Loss Loss
February 448.0 12.6 165.5 36.9 6.0 1.3
March 496.0 41.7 163.5 33.0 1.5 0.3
April 449.0 27.6 40.3 9.0 0.0 0.0
May 488.0 22.8 58.0 11.9 0.0 0.0
June 480.0 36.3 68.0 14.2 0.0 0.0
July 496.0 28.9 180.8 36.4 12.0 2.4
Total 2857.0 169.9 676.1 23.7 19.5 0.7
Table 1: JCMT weather statistics for semester 94A.
Month Avail Total ANT INS COMP SOFT CAR OTH
February 448.0 24.4 5.3 11.7 0.3 7.0 0.0 0.1
March 496.0 2.6 0.0 1.5 0.0 0.0 0.0 1.1
April 449.0 8.3 1.2 3.3 0.0 0. 0.0 3.3
May 488.0 35.5 24.5 9.2 0.3 1.3 0.0 0.0
June 480.0 7.4 0.0 2.3 2.7 0.2 0.0 2.2
July 496.0 20.1 0.3 10.8 6.6 0.6 0.0 2.0
P(hrs) 2857.0 98.3 31.3 38.8 9.9 9.6 0.3 8.7
P(%) 4.5 3.4 1.1 1.4 0.3 0.3 0.0 0.3
B(hrs) 8.9 0.0 6.2 1.4 0.0 0.0 1.3
Table 2: JCMT fault statistics for semester 94A. Wherever possible the faults are categorised into ANT = antenna; INS = instrument; COMP = computer hardware; SOFT = software; CAR = carousel; with the remainder going to OTH = other. The figures in the table may not appear to add up correctly due to rounding in the original program. P defines the time lost from Primary projects. The category B is the time lost to Backup projects. The total clear time lost (including backup time) for semester 94A is 4.5%.
|