JAC Style guide: template
Weather and Fault Statistics for Semester 95B
The following tables present the weather loss and fault loss for semester 95B. Full details are stored on
database at the JAC and interested readers are referred there for further information. The total
clear time lost from primary programmes for semester 95B is 3.2%.
Month Avail Extend Primary % Backup %
Hrs Hrs Loss Loss
August 480.0 17.5 8.3 1.7 0.0 0.0
September 480.0 19.5 16.3 3.4 3.3 0.7
October 464.0 13.7 14.9 3.2 12.0 2.6
November 480.0 15.8 97.5 20.3 44.0 9.2
December 480.0 29.1 66.7 13.9 4.0 0.8
January 472.0 13.4 205.4 43.5 110.5 23.4
Total 2856.0 109.0 409.1 14.3 173.8 6.1
Table 1: JCMT weather statistics.
Month Avail Total ANT INS COMP SOFT CAR OTH
August 480.0 18.7 5.0 9.5 1.6 1.7 0.0 1.1
September 480.0 8.4 2.4 2.6 1.1 2.3 0.0 0.0
October 464.0 11.8 1.5 8.3 0.9 0.6 0.5 0.0
November 480.0 18.4 0.2 8.5 0.3 0.2 0.0 9.3
December 480.0 13.6 1.3 8.1 0.0 2.9 0.0 1.3
January 472.0 7.5 0.0 6.2 0.3 0.0 0.0 1.0
P(hrs) 2856.0 78.4 10.4 43.2 4.2 7.7 0.5 12.7
B(hrs) 0.1 0.0 0.1 0.0 0.0 0.0 0.0
Table 2: JCMT fault statistics. Wherever possible the faults are categorised into ANT = antenna; INS = instrument; COMP = computer hardware; SOFT = software; CAR = carousel; with the remainder going to OTH = other. The figures in the table may not appear to add up correctly due to rounding in the original program. P defines the time lost from Primary projects.
The category B(hrs) is the time lost to Backup projects.
Last Modification Date 1996/04/08 - Last Modification Author: Graeme Watt (gdw)
|