Inclinometry on the evening of 970410
imc & wel
Summary : regular CW inclinometry following the welding of track joint 7/8
during the day by Ian Pain and co-workers.
Inclinometry started at 20:30 as allowed by IP : the track is still
cooling at this point, so it is possible that some inclinometry
structure seen in these data will be thermal in nature.
Comparison of the new data with that of 970325, exemplified by the data
from the Y-axis of the inclinometer on the Left A-frame,
LY   , shows substantial change. The
difference plot shows humps and spikes of size 5".
The
new model was created and installed. The difference between the
new model and the old one of 970325 is shown
here .
Follow-up inclinometry has been requested to account for
any thermal problems during this run.
Return to POINTING REPORTS
imc 970411
|