970615 report
Inclinometry on the evening of 970605
gms & kkp
Summary
- CW inclinometry following the welding of track joint 6/7.
- new track model installed
Inclinometry started at 20:00 - mean temperature of antenna legs 6C,
falling to 3C at end => an average of 4.5C.
Changes of as much as 3" are seen, principally at azimuths 195 and 292,
where the wheels 3 and 2 traverse the joint.
A new track model was created and installed. The
difference between this model and the previous one of 970529
is shown
here .
The interpretation is similar to that following the
970417 work.
This is the last of the joints to be welded, and was celebrated with a
feast
Return to POINTING REPORTS
imc 970615
|