Surface differences, 15 June 2002
Surface differences, 15 June 2002
On 15 June between 17h46 and 16 June 1h30, six 80 GHz maps have
been made.
The first five maps were on a standard 40 arcsec raster, the
last map was on a tilted 20 arcsec raster.
In between some of
the maps some panels were moved for adjuster tests.
The plots below show the difference of the maps with respect
to map 5 which was started at 22h15
(see the map at the bottom of this page).
It is seen that the differences decrease in size for the first three maps
to about +/- 10 micron,
but increase again to almost 40 micron (in one corner) for the last map.






|