Joint Astronomy Centre
Show document only
JAC Home
JCMT
UKIRT
Contact info
JAC Divisions
OMP
Outreach
Seminars
Staff-only Wiki
Weather
Web Cameras
____________________

Observing at UKIRT
Service Observing
UKIDSS Survey Operations
Target of Opportunity
Calibration & Standards
Astronomical Utilities
UKIRT Archive
Public wiki
Accessing UKIDSS Data
Accessing PI Data
Reduction Cookbooks
Telescope
Site Quality
Instruments
Newsletter/Publications
UKIRT Faults
JAC Safety Manual
Safety Briefing
UKIRT 06A Allocations

UKIRT 06A Allocations








mandatory observing conditions
Patt No. PI award (mode)
comments observer summit nights moon seeing water cloud
1 Oka 12h (c)
relaxed seeing constraint y
3×0.5 any 0.8 0.09 thin?
2 Teanby 15h (c)
longslit only; no IFU y
3
any 0.8 0.09 for M clear
3 Scholz 21h (w)

y
4
req. grey 1 any thin
4 Hewett 40h (c)

y
7
any 0.6 any thin
5 Brocksopp 5h (c)
trigger only when regular monitoring possible n
0
any any any any
9 Miller 3x5h (c)
three spaced half nights. Restrict wavelength coverage y
4×0.5
any any any any
10 Lucey 10h (w)

n
0
req. grey 0.8 any thin
11 Fender 20h (c)

n
0
req. grey 0.8 any thin
12 Fasano 10h (w)

y
3
req. grey 0.8 any clear
13 Gledhill 6h (c)

n
0
any any 0.15 (L) thin
14 Smartt 10h (w)
best seeing possible needed n
0
any 0.6 any clear?
15 Jarvis 30h (c)
three targets only y
4
any 0.8 any clear
16 Geballe 20h (c)
partly dry time needed y
4 (inc.1×0.5 for 49)
any any 0.09 thin
17 Vink 23h (c)
remaining needed time from queue nights
y
2
any 0.6 any thin
18 Geballe 10h (c)
two second halves y
2×0.5
any 0.8 0.15 thin
19 Nisini 18h (c)
three first halves if possible to schedule n
0
req. grey 0.6 any thin
20 Zapatero Osorio
15h (c)
L stars only y
3 (inc.1×0.5 for 49) req. grey 0.8 any thin
21 Gledhill 20h (c)

y
2.5
any 0.6 any thin
22 Chrysostomou 8h (c)
two half nights y
2.5
any 0.8 0.09 thin?
24 Jameson 8h (w)
thick cirrus only n
0
any 1 any thick
25 Smail 25h + 30h(06B) (w)

y
5
req. grey 0.8 any thin
26 Lumsden 30h (c)

y
5
any any 0.09 thin for long L
33 Warren 12h (c)

n
0
req. grey 0.8 any clear
35 McHardy 20h (w)
four halves, May/June y
5
any 0.8 any clear
36 Tanvir 35h + 35h(06B) (c/w)

n
0
any 1 any thin
38 Davis 25h (c)

y
5
any .6 ifu any clear ifu
39 Buchanan 30h (c)
part dry n
0
any any 0.09 L spec clear imaging
40 Romanowsky 13h (w)

y
4
any any any clear
43 Blundell 12h (c)
to cover 15 visits if possible to schedule n
0
any any any thin
45 Gosling 4h (w)

n
0
any 0.8 any thin
46 Swinbank 50h (c)

y
5
req dark 0.7 any thin
47 Gledhill 15h (c)
assumes lower overhead n
0
any 0.6 any thin
48 Ferguson 22h (w)

n
0
any 0.8 any thin
49 Evans 10h + 30h(06B)+30h(07A) (c)

y
2×0.5 (see above) any any dry for l,m thin for non-L,M
52 Hodgkin & Pinfield
100h (w)
to be done in UKIDSS poor-weather time n
0
any >1.2 any thin










UH and Japanese Projects                  
J7 Matsuoka 1n (c)

classical classical classical classical classical classical
J9 Inada 1n (c)

classical classical classical classical classical classical
J8 Ishihara 2n (c)

classical classical classical classical classical classical
J2 Tanaka 2n (w)

classical classical classical classical classical classical




classical classical classical classical classical classical
UH Projects                  
H18A sanders 7*0.4n (w)

classical classical classical classical classical classical
H14A takamiya 4n (c)

classical classical classical classical classical classical
H32A yang 4n (c)

classical classical classical classical classical classical
TBD TBD 7n (w)

classical classical classical classical classical classical
TBD TBD 7*0.6n (w)

classical classical classical classical classical classical




classical classical classical classical classical classical
Long Term from previous semesters              
u/05b/18 van Loon 3h
n/a





u/05a/22
Evans
10h total, through to 06B inclusively; ToO
-
n





u/04b/18
Eyres
up to 6x0.5N total through to Semester 06A

n/a















Notes                  
grey time requests will be assessed for need before scheduling



















































































































Contact: Andy Adamson. Updated: Wed May 17 15:56:23 HST 2006

Return to top ^