|
|
|
|
View of entire lifting arrangement. Comprised of a harness
and u bolt attached to the backing structure, a manual chain hoise and a
harness under the encoder.
|
Digital dial gauge in position to measure vertical
motion/displacement of the encoder
|
|
|
|
|
|
|
|
Last minute instructions from Vernon while Kevin completes
hookup of lifting harness
|
Part of the rube goldberg solution to releiving tension on the
anti-rotation rods
|
Nash's solution for attaching (digital dial gauge)
displacement micrometer to measure movement of the encoder
|
|
|
|
|
|
|
|
Adjusting tensioner rods (anti rotation)
|
Closeup of lifting harness
|
Kevin using hoist and harness to lift encoder (removing
tension from anti rotation rods.
|
|
|
|
|
|
|
Nash disconnecting the harness used to remove tension from
anti rotation rods.
|
Nash making final adjustments to anti rotation device
|
|
|