Here is the twenty fourth round of modifications made to the JAC Safety Manual as per the JAC Safety Committee Meeting of 16-December-05.  Note: Modifications to the front and back covers will appear in the hard copy versions only.  


Chapter

Section

 

1
Introduction
A.2
- update reference to PPARC Revised Health and Safety Policy Statement
  1. Site Safety Policy
  1. The general health and safety at work policy of the Particle Physics and Astronomy Research Council is stated in GN 04/03 GN 13/05 of which a copy is posted on the Safety Notice board.

8
General Shop Policies

A.2.a.v.

- add text (italic) to Supervisor Responsibilities - item v.:
" Makes periodic inspections of shop areas and other industrial areas.Carries out risk assessment where appropriate. Notes all deficiencies and initiates corrective actions.

8

A.2.b.v

- add text (italic) for clarification to Employee Responsibilities item v.:
"Assists the supervisor in identifying and marking shop floor areas to identify safe walking areas.

8

A.2.b.vii.

- grammar: add 'about' to second sentence:
"Seeks further guidance on any safety related issues about which they feel unclear."

8

A.2.b.i (new)

- add new clause "i" and re-number:

b. Employee
i. Who is physically or otherwise unfit shall not operate hoists, cranes, manlifts or other lifting equipment.

8

A.2.c.i.

- grammar: change 'carried out' to implemented

8

A.3.a.

Shop Procedures Including Helifier and Vehicle Bays:
- 1st sentence: change 'should' to  shall  and 'walkway' to walkways
'Persons entering the shop and helifier bay shall stay within the yellow lined walkways unless explicitly authorized to leave them by the Facility Maintenance Manager.

-  bullet: reverse order of the two sentences:

'Perforated shoes, sandals or cloth sneakers are expressly prohibited.Closed toe shoes shall be worn at all times when in these areas.'

8

A.3.h.

-  1st sentence add  or jewelry  to end  of sentence:

Any employee using portable fixed tools (drill press, jig or band saw) must not wear loose clothing or jewelry.
-
last sentence: becomes new f.
f. In any operation where the stock is stationary it must be clamped down (attempting to hold stock with hands will not be permitted).
-
re-alphabetize beginning from new f

8

A.3.n.

-  add and they have been bled to end of sentence:

'Air hoses must not be disconnected until they have been bled and pressure is securely turned off at its source and they have been bled.'

8

A.3.o.

-  add potentially  to sentence:

'When working on materials or coolant that potentially generate harmful fumes, adequate ventilation and exhaust devices shall be used.'

8

A.3.q.

- 1st sentence add: express
 
'Off hours use of machinery is restricted to authorized operators only with the express consent of the Facility Maintenance Manager.'

8

A.4.j.

- change sentence to read:
 'Proper eye protection along with safety shoes and other appropriate protective gear where warranted must be used.'

8

B.2.b.i.

- change sentence to read:

'Inspects daily the powered industrial vehicle before it is used in accordance with section B5. Items to be checked should include the forks, batteries, wheels, cables, lights, and controls.'

8

B.2.b.ii

- remove text from 2nd sentence  and switch  1st and 2nd sentences:

'Does not use a malfunctioning vehicle. if the defect impairs the safe operation or use of the vehicle. Reports any defects or malfunctions to the supervisor immediately.'

8

C.2.b.ii.

- switch 1st  and 2nd sentences:

'Does not use malfunctioning or damaged equipment. Reports any defects or malfunctions to the supervisor immediately.'

8

C.2.c

- remove items iii., v., and vii. (no longer  the Site Safety Advisor's responsibilities) and re-alphabetize

iii. Maintains an inventory of manually operated hoists (chain operated, lever operated).
iv. Maintains an inventory of the below-the-hook rigging and lifting devices
v.  Inspects all equipment on a monthly basis and records inspection.
vii. Witnesses load tests for new or modified equipment.

 8

C.2.d.

- list additional Facility Maintenance Manager responsibilities:

  1. Schedules yearly inspection by certified inspectors.
  2. Maintains an inventory of the below-the-hook rigging and lifting devices.
  3. Ensures that all equipment are inspected on a monthly basis and updates records.
  4. Witnesses load tests for new or modified equipment.
  5. Maintains an inventory of manually operated hoists (chain operated, lever operated)

8

C.4.

ref: Action: 53-2-01 :  add clause in bold before (a):

The operator shall ensure lockout/tagout of any equipment capable of endangering operation of a hoists, cranes, manlifts or other lifting equipment in accordance with Chapter 13.

8

C4a.i., C4b.i.,
C4c.i, C4d.i.

- switch 2nd sentence 'Report any defects to supervisor.' and  3rd  sentence 'Do not use equipment if it is defective'  

8
C.4.b.iv
ref: Action 53-2-02: reword this section, move to and make this clause "i." in Section A.2.b, and re-number:
iv. The operator shall not operate the crane or hoist  when physically or otherwise unfit.

Section A.2.b. Employee
i. Who is physically or otherwise unfit shall not operate hoists, cranes, manlifts or other lifting equipment.

8
C.4.b.v.
ref: Action 53-2-03: reword this section for clarification:
  1. The operator shall respond to signals from the person who is directing the lift, or an appointed person. When a signal person is not required as part of the crane or hoist operation, the operator is then responsible for the lift. However, the operator shall obey a stop signal at all times, no matter who gives it.

  1. The operator is responsible for operation of the crane or hoist.  If required, an appointed person will direct the crane operation by approved hand signals.  A stop signal shall be executed immediately no matter who gives it.

8

C.4.b.vi. (new)

- add new text and re-number:
 The operator shall obey a stop signal at all times, no matter who gives it. 

8

C.4.c.ii.

- remove first sentence:  'Determine weight of the load. The weight of the load shall be within the rated capacity of the lifting equipment.' 

8
C.4.d. (new)
- add new clause, insert at new "i" and re-number:
  1. Manbaskets shall only be used for the express purpose they are supplied for and no other operation.

8

C.4.d.xiv.

- move to follow item  v

8

C.4.d.xiii.

- move to follow item vii

11
Occupant Emerg Plans & Equip Locations - JCMT & UKIRT
D.3.d.
- reference ACTION 53-1-06:  SCC to re-draft this section:
was:
d. Following site evacuation due to a severe storm, re-enter the building only as directed by the Designated Official. (Note: Re-entry following a telescope closure, which is not an evacuation, is at the discretion of the TSS.

changed to:
d. If, after a severe storm requiring evacuation of the building, damage to the building is suspected or entry appears hazardous, re-enter the building only as directed by the Designated Official.

13
Lockout/Tagout Policy

C.j.

- last sentence: fix  puntuation

13

C."l"

- list as item "l":   l.  Shall: The word "shall" always implies a mandatory requirement. 

13
D.a.iv.
- Supervisor responsibilities:  remove 'The supervisor' from the sentence: 'The supervisor Shall develop, document and utilize procedures.'
13
E.d.v.
- 'Safety Advisor' should read Site Safety Advisor
13
F.a.i.
- update last sentence to read:  'For Hilo work, inform the Facility Maintenance Manager or in his absence the Chief Engineer.'
13
F.b.iv.
- add  DO NOT TAKE THE MASTER KEY to end of the note:
Note that the Castell key lockout systems use "Slave" keys and "Master" keys. To use them, remove the master key from the lower switch and insert it into the master/slave unit above. Then one or more of the slave keys can be taken out. The master key cannot be returned to the master switch until all slave keys are returned. DO NOT TAKE THE MASTER KEY
13
F.g.i.
- 3rd bullet: change 1st sentence: Owner is on leave and cannot be reached by telephone contacted.
13
G.c.
- add to heading: Safe Isolation for Fluid Systems (excluding cryogens)
13
G.e.
- change heading to read: 'Safe Isolation for Cyrogenic Liquids Systems
13
Appendix 2
Lockout/Tagout Checklist

- number 1: add Notify all affected employees that a lockout is required and the reason therefore.
Preparation for shutdown. Before an authorized or affected employee turns off a machine or equipment, the authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. Notify all affected employees that a lockout is required and the reason therefore.
13
Appendix 3
Specific Documented Procedures: JCMT

(Specific Documented Procedures: JCMT): HMB to redraft and consolidate castell key notes throughout this appendix. ACTION 53-2-04: HMB
13
Appendix 3
C
- change heading to read: Access to antenna Rx cabin and backing structure for routine adjustments and services
13
Appendix 3
F.6.
- change sentence to read:  When the work is finished, inform the TSS/WL, remove any clamps if applicable, replace the castell keys and any clamps, remove your name from the board, and verify that the drives are working normally.
13
Appendix 3
J.1.
- 2nd sentence - change to read:  If possible, Establish two-way communication, for example, using the telephone system.
13
Appendix 3
L.
change heading and sentence to include tetrapod
- 'Access to the SMU and Tetrapod for Major Work'
-
' This procedure applies to access to the SMU for removal from the tetrapod and removal of the tetrapod, via the overhead crane.'
13
Appendix 4
Specific Documented Procedures: UKIRT

A.2.

- replace this section with text from Appendix 3, Section A2:

A. End of day checks after anyof these procedures

  1. If the TSS/WL on arrival finds that a lockout has been left in place but the member of staff whose name appears on the lock has left, they shall take the following action:
    1. Try to contact the member of staff for permission to remove the lockout. (Typically, in a vehicle or at HP.)  If they confirm that you may remove the lockout, do so. This will require the use of side cutters or even bolt cutters - do not do it lightly.
    2. If you cannot contact the member of staff, check to see if the work appears to be complete and that no obstructions have been left in the work area. Do not remove the lockout yet.
    3. Attempt to contact the Site Safety advisor, failing whom the Chief Engineer, failing whom the Designated Official, for permission to remove the lockout. If none of them can be contacted, or if they are not able to verify that the lockout may be removed. It is recognized that this may well result in loss of telescope time.
  1. If the TSS/WL finds that a lockout has been left in place but the member of staff whose name appears against it has left, he shall take the following action:
    1. Try to contact the member of staff for permission to remove the lockout. (Typically, in a vehicle or at HP.) If they confirm that you may remove the lockout, do so. This may require use of  a bolt cutter and safety glasses.
    2.  
    3. If you cannot contact the member of staff, check to see if the work appears to be complete and that no obstructions have been left in the work area. Do not remove the lockout yet.
    4.  
    5. Attempt to contact the Site Safety Advisor, failing whom the Chief Engineer, failing whom the Designated Official, for permission to remove the lockout. If none of them can be contacted, then the lock may not be removed.  It is recognized that this may well result in loss of telescope time.
    6.  
    7. Make sure that the member of staff concerned is informed as soon as possible that the lockout was removed.
13
Appendix 4
B.3 & 4

- reverse number order to correct sequence of procedure
13
Appendix 4
C.2 & 3

- update and re-number this section as follows:

C. Telescope structure - minor work
  1. Lock out the telescope drive power as follows: using the Castell Key System (TD).

    • use the castell key system (TD),
    • use the multiple lockout facility; DO NOT take the master key (TD),
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.

Note: If required to do the work, you may remove your castell key from the board and keep it on your person.  DO NOT remove your name and date from the board until the work is complete.

  1. If working on or above the mirror covers, also lock out the mirror covers power (MC)  (see Chapter 10, Section E 12 for access to the top of the mirror covers).

  2. Verify, by attempting to operate the controls, that the telescope drives, and if  applicable, the mirror cover drives, are disabled.

  3. When the work is finished,

  • replace the castell key (TD),
  • replace the mirror cover castell key (MC) if applicable,
  • verify that the power has been restored,
  • remove your name and date from "lockout" board,
  • inform the TSS/WL that you have finished.

13
Appendix 4
D.2, 3, & 4
- update and re-number this section  as follows:

D. Telescope structure - major work
  1. Lock out the telescope drive power as follows: using the Castell Key System (TD).

    • use the castell key system (TD),
    • use the multiple lockout facility; DO NOT take the master key (TD),
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.
  1. If working on or above the mirror covers, also lock out the mirror covers power (MC)  (see Chapter 10, Section E 12 for access to the top of the mirror covers).

  2. Verify, by attempting to operate the controls, that the telescope drives, and if applicable, the mirror cover drives are disabled.

  3. Attach the telescope tethers.

  4. When the work is finished:

  • remove the tethers,
  • replace the castell key (TD),
  • replace the mirror cover castell key (MC) if applicable,
  • remove your name and date from "lockout" board,
  • inform the TSS/WL that you have finished.

13`
Appendix 4
E. 2, 3, & 4
- update and re-number this section as follows:

E. Access to mirror covers
  1. Lock out the telescope drive power as follows: using the Castell Key System (TD).

  • use the castell key system (TD),
  • use the multiple lockout facility; DO NOT take the master key (TD),
  • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.
  1. Lock out the mirror covers power using the Castell Key System (MC).

  • use the castell key system (MC),
  • use multiple lockout facility; DO NOT take the master key (MC),
  • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.
  1. Verify, by attempting to operate the controls, that the telescope and the mirror covers drives are disabled.
  2. When work is finished:

  • replace castell keys (MC) and (TD),
  • verify the power has been restored to both systems,
  • remove your name and date from "lockout" board,
  • inform the TSS/WL that you have finished.
13
Appendix 4
G.2.
- update and re-number this section as follows:

G. Dome Catwalk
  1. Lock out the power to the dome as follows: using the Castell Key System (DD).

    • use the Castell key system (DD),
    • use the multiple lockout facility, do not take the master key (DD),
    • Hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.  
  2. If necessary, lock out either the 208V or 480V dome power, or both depending upon which systems are to be worked on.

  3. The windblind vertical bus duct on the right side shutter arch girder carries exposed 480V and so when working in this area the 480V dome power shall always be locked out.

  4. Verify, by attempting to operate the controls, that the dome drives are disabled.

  5. If any of the systems supplied by the 208V or 480V dome power were locked out - verify, by attempting to operate the controls, that these systems are disabled.

  6. When work is  finished:

  • replace the Castell key (DD),
  • if applicable, remove  your lockout from either or both the 208V and 480V dome power,
  • verify the power has been restored to the dome drives and other equipment,
  • remove your name and date from "lockout" board,
  • inform the TSS/WL that you have finished.

13
Appendix 4
H.4

- add new number 4: use same text as section G.7.
-
with additions to be made by  SCC (ACTION 53-2-05)  add new bullet 3 : turn local control switch(es) to AUTO or HAND as required,

H. Dome Catwalk - Dome Ventilation Ssytem (DVS) / Weather Tight Enclosure (WTE) Manual Operation
  1. When work is  finished:
  • replace the Castell key (DD),
  • if applicable, remove  your lockout from either or both the 208V and 480V dome power,
  • turn local control switch(es) to AUTO or HAND as required,
  • verify the power has been restored to the dome drives and other equipment,
  • remove your name and date from "lockout" board,
  • inform the TSS/WL that you have finished.

13
Appendix 4
I.
- update and re-number this section as follows:
I. Dome Catwalk - Dome Ventilation System (DVS) / Weather Tight Enclosure (WTE) Servicing

This procedure covers access to the catwalk to service, maintain, or repair the DVS system. Steps are as for the procedures in (G) above except that, in addition, the  

  1. Follow procedures in (G) above.
  2. DVS power shall be locked out using the DVS system circuit breakers or the dome 208V switch (see section B of this appendix). 

    1. DVS motor circuit breaker: Panel DC breaker #8 isolates power to all the WTE motors. This breaker shall be locked out for maintenance and repair of the WTE's.
    2.  
    3. DVS PLC circuit breaker: Panel DC breaker #14 isolates power to the PLC electronics enclosures located on the catwalk to the left of the dome shutter (including control power to the WTE's). This breaker can be locked out alone or in addition to #8 for electrical/electronics related maintenance and repair.

The OFF position on the WTE local control station switch cannot be used to lock out a WTE for maintenance or servicing as it is in the control circuit and is not an acceptable energy isolating device.

  1. Verify, by attempting to operate the controls, that the power to the WTE motors is off and if  applicable, to the DVS PLC electronics.

  2. When work is finished:
  • remove lockout from 208V dome power switch or the panel DC breakers #8 or #14,
  • replace thae Castell key (DD) to restore dome drive power,
  • verify the power has ben restored to the dome drives and DVS systems,
  • remove your name and date from "lockout" board,
  • inform the TSS/WL that you have finished.

13
Appendix 4
J.2
J. Dome Shutter
- change item #2 to read:
  1. Lock out the dome drive power as follows: using the Castell Key System (DD)
    • use the castell key system (DD),
    • use the multiple lockout facility; DO NOT take the master key (DD),
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.
13
Appendix 4
K.2 & 3
- change heading and  items #2 & 3 to read:

I. Genie Articulating Boom Lift (access the Dome)
  1. Lock out the dome drives as follows: using the Castell Key System (DD).
    • use the castell key system (DD),
    • use the multiple lockout facility; DO NOT take the master key (DD).
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board. 
  1. Lock out the telescope drive power as follows: using the Castell Key System (TD).
    • use the castell key system (TD),
    • use the multiple lockout facility; DO NOT take the master key (TD).
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.

13
Appendix 4
L (new)
- insert missing heading, change item #2, and re-alphabetize
  1. Genie Articulating Boom Lift (access the Telescope)
    1. Lock out the telescope drive power as follows: using the Castell Key System (TD).
    • use the castell key system (TD),
    • use the multiple lockout facility; DO NOT take the master key (TD).
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.

13
Appendix 4
M

- re-number and change new item #2 as follows:

M. Dome Drives

  1. Inform the TSS/WL of your plans and make entry in the log book.

  2. Lock out the dome drives as follows: using the Castell Key System (DD).

    • use the castell key system (DD),
    • use the multiple lockout facility; DO NOT take the master key (DD),
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.
  3. Verify, by attempting to operate the controls, that the power is off to the dome drives and telescope drives.

  4. When work is finished:

    • replace the castell key (DD) to restore dome drive power,
    • verify the power has been restored to the dome drives,
    • remove your name and date from "lockout" board,
    • inform the TSS/WL that you have finished.

13
Appendix 4
N.2 & 3

- change items #2 & 3 to read as follows:

N. Secondary Mirror Unit (SMU)

  1. Lock out the mirror covers power as follows: using the Castell Key System (MC).

    • use the castell key system (MC),
    • use the multiple lockout facility; DO NOT take the master key (MC),
    • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.
    1. Lock out the telescope drive power as follows: using the Castell Key System (TD).
      • use the castell key system(TD),
      • use the multiple lockout facility: DO NOT take the master key (TD).
      • hang the key on the appropriate hook on the "lockout" board in the Control Room, write your name and date on the board.

Addendum 1
List of Post Holders
- change: Chairman of the Site Safety Committee from W. Light to S.Craig
- remove: Ed Lundin, Nick Rees, SPIFI and FTS groups from Authorised Equipment Operators lists
- add: Chris Roberts to AzTEC Group (JCMT Rx Cabin Jib Hoist only) list
- add: Agency Staff as separate heading under All Jib Hoist (JCMT, UKIRT & Hilo)
Addendum 2
Schedule for Manual Review
- update
Addendum 5
JAC Safety summary sheet for visitors of less than 2-months duration
- update Workshops section to read:

WORKSHOPS:

Stay out of the mechanical workshops at JCMT and UKIRT unless explicitly told you may enter by a JAC staff member. If you enter the JAC shops, stay within the yellow lines and follow the footwear policy noted in Chapter 8 Section A3a of the JAC Safety Manual. unless explicitly authorised by a JAC staff member.

Addendum 7
Procedures for Eye Exam Related to VDT Use
SCC to have ILM review  and update ACTION 53-2-06
Addendum 8
Mauna Kea Vehicle Procedures Checklist
- 3rd bullet under the heading "Vehicle Procedures": SCC to reword as there will be no JCMT TSS on duty during the JCMT Shutdown. ACTION 54-1-05
- updated road conditions email address
Addendum 9
Mauna Kea Winter Logistics (MKSS doc)
- replace with latest copy received from MKSS
Addendum 11
Glossary
- change definition of  ' agency staff ':
agency staff:  Staff seconded by the international partner agencies of the JCMT. Effort hired through external agencies.

-
add: PLC:  Programmable Logic Control
Addendum 12
Evacuation Maps
SCC to simplify current maps to show only evacuation routes. ACTION 53-2-09
Safety Manual Phone #s

- updated Chief engineer information
Back cover
Important Phone Numbers
- added to Vehicles: F-350 Pickup 14  - 936-2966
-
removed JAC Numbers: HP based Emergency Cellular Phone - 936-2966

    


     