|
Chapter
|
Section
|
|
1
Introduction
|
A.2
|
-
update reference to PPARC Revised Health and Safety Policy Statement
- Site Safety Policy
- The general health and safety at work policy of the
Particle
Physics and
Astronomy Research Council is stated in GN 04/03 GN 13/05 of which a copy is
posted
on the Safety Notice board.
|
|
8
General Shop Policies
|
A.2.a.v.
|
- add text (italic) to Supervisor
Responsibilities - item v.:
" Makes periodic inspections of shop areas and other industrial areas.Carries
out risk assessment where appropriate. Notes all deficiencies and
initiates corrective actions.
|
|
8
|
A.2.b.v
|
- add text (italic) for
clarification to Employee Responsibilities item v.:
"Assists the supervisor in identifying and marking shop floor areas to
identify safe walking areas.
|
|
8
|
A.2.b.vii.
|
- grammar: add 'about' to second
sentence:
"Seeks further guidance on any safety related issues about
which they feel unclear."
|
|
8
|
A.2.b.i
(new)
|
- add new clause "i" and re-number:
b. Employee
i. Who is physically or otherwise unfit shall not
operate hoists, cranes, manlifts or other lifting equipment.
|
|
8
|
A.2.c.i.
|
- grammar: change 'carried out' to implemented
|
|
8
|
A.3.a.
|
Shop
Procedures Including Helifier and Vehicle Bays:
- 1st sentence: change 'should' to shall and 'walkway' to walkways
'Persons entering the shop and helifier bay shall stay within the
yellow
lined walkways unless
explicitly authorized to leave them by the
Facility
Maintenance Manager.
- bullet: reverse order of
the two sentences:
'Perforated
shoes, sandals or cloth sneakers are expressly prohibited.Closed toe
shoes shall be worn at all times when in these
areas.' |
|
8
|
A.3.h.
|
-
1st sentence add or
jewelry to end of sentence:
Any employee using portable fixed tools (drill press, jig
or band
saw)
must not wear loose clothing or
jewelry.
- last sentence:
becomes new f.
f. In any
operation
where the stock is stationary it must be clamped down (attempting to
hold
stock with hands will not be permitted).
- re-alphabetize beginning from new f
|
|
8
|
A.3.n.
|
-
add and they have been bled to
end of sentence:
'Air hoses must not be disconnected until they have been
bled and
pressure
is securely turned off at its source and
they have been bled.' |
|
8
|
A.3.o.
|
-
add potentially to
sentence:
'When working on materials or coolant that potentially generate harmful
fumes,
adequate
ventilation and exhaust devices shall be used.' |
|
8
|
A.3.q.
|
-
1st sentence add: express
'Off hours use of machinery is
restricted
to authorized
operators only with the express
consent of the Facility Maintenance Manager.'
|
|
8
|
A.4.j.
|
-
change sentence to read:
'Proper eye protection along with safety shoes and other appropriate protective
gear where warranted
must be used.'
|
|
8
|
B.2.b.i.
|
-
change sentence to read:
'Inspects daily the powered
industrial vehicle before it is
used in accordance with section B5.
Items
to be checked should include the forks, batteries, wheels, cables,
lights,
and controls.'
|
|
8
|
B.2.b.ii
|
-
remove text from 2nd sentence and switch 1st and 2nd
sentences:
'Does
not use a malfunctioning vehicle. if the defect impairs the safe
operation
or use of the vehicle. Reports any defects or malfunctions to
the supervisor
immediately.' |
|
8
|
C.2.b.ii.
|
-
switch 1st and 2nd sentences:
'Does
not use malfunctioning or damaged equipment. Reports any defects or
malfunctions to the supervisor
immediately.'
|
|
8
|
C.2.c
|
-
remove items iii., v., and vii. (no longer the Site Safety
Advisor's responsibilities) and re-alphabetize
iii. Maintains an
inventory of manually operated hoists (chain
operated,
lever
operated).
iv. Maintains an inventory of the below-the-hook rigging and lifting
devices
v.
Inspects all equipment on a monthly basis and records
inspection.
vii. Witnesses load
tests for new or modified equipment.
|
|
8
|
C.2.d.
|
-
list additional Facility Maintenance Manager responsibilities:
- Schedules yearly inspection by certified inspectors.
- Maintains an inventory of the
below-the-hook rigging and lifting devices.
- Ensures that all equipment are
inspected on a monthly basis and updates records.
- Witnesses load tests for new or
modified equipment.
- Maintains an inventory of
manually operated hoists (chain operated, lever operated)
|
|
8
|
C.4.
|
ref: Action: 53-2-01 : add clause in
bold before (a):
The
operator shall ensure lockout/tagout of any
equipment capable of endangering operation of a hoists, cranes,
manlifts or
other lifting equipment in accordance with Chapter 13. |
|
8
|
C4a.i.,
C4b.i.,
C4c.i, C4d.i.
|
-
switch 2nd sentence 'Report any defects to supervisor.' and
3rd sentence 'Do not use equipment if it is
defective'
|
8
|
C.4.b.iv
|
ref:
Action 53-2-02: reword this section, move to and make this clause "i."
in Section A.2.b, and re-number:
iv. The operator
shall not operate the crane or hoist
when
physically
or otherwise unfit.
Section A.2.b.
Employee
i. Who is physically or otherwise unfit shall not
operate hoists, cranes, manlifts or other lifting equipment.
|
8
|
C.4.b.v.
|
ref:
Action 53-2-03: reword this section for clarification:
-
The operator shall
respond to signals from the person who
is
directing
the lift, or an appointed person. When a signal person is not required
as part of the crane or hoist operation, the operator is then
responsible
for the lift. However, the operator shall obey a stop signal at all
times,
no matter who gives it.
- The operator is responsible for operation of the crane or
hoist. If required, an appointed person will direct the crane
operation by approved hand signals. A stop signal shall be
executed immediately no matter who gives it.
|
|
8
|
C.4.b.vi.
(new)
|
-
add new text and re-number:
The operator shall obey a
stop signal at all
times,
no matter who gives it.
|
|
8
|
C.4.c.ii.
|
-
remove first sentence: 'Determine weight of the load.
The weight of the load shall
be
within the
rated capacity of the lifting equipment.'
|
8
|
C.4.d.
(new)
|
-
add new clause, insert at new "i" and re-number:
- Manbaskets shall only be
used for the express purpose they are supplied for and no other
operation.
|
|
8
|
C.4.d.xiv.
|
-
move to follow item v
|
|
8
|
C.4.d.xiii.
|
-
move to follow item vii
|
11
Occupant Emerg Plans & Equip
Locations - JCMT & UKIRT
|
D.3.d.
|
-
reference ACTION 53-1-06: SCC to re-draft this section:
was:
d. Following site evacuation due to a severe storm, re-enter the
building only as directed by the Designated Official. (Note: Re-entry
following a telescope closure, which is not an evacuation, is at the
discretion of the TSS.
changed to:
d. If, after a severe storm
requiring evacuation of the building, damage to the building is
suspected or entry appears hazardous, re-enter the building only as
directed by the Designated Official.
|
|
13
Lockout/Tagout Policy
|
C.j.
|
-
last sentence: fix puntuation
|
|
13
|
C."l"
|
-
list as item "l": l. Shall: The word
"shall" always implies a mandatory requirement.
|
13
|
D.a.iv.
|
-
Supervisor responsibilities: remove 'The supervisor' from the
sentence: 'The supervisor
Shall develop, document and utilize procedures.' |
13
|
E.d.v.
|
-
'Safety Advisor' should read Site
Safety Advisor
|
13
|
F.a.i.
|
-
update last sentence to read: 'For Hilo work, inform the Facility Maintenance Manager or in his absence the Chief Engineer.'
|
13
|
F.b.iv.
|
-
add DO NOT TAKE THE MASTER KEY to end of the
note:
Note that the Castell key lockout systems use "Slave" keys and
"Master"
keys. To use them, remove the master key from the lower switch and
insert
it into the master/slave unit above. Then one or more of the slave keys
can be taken out. The master key cannot be returned to the master
switch
until all slave keys are returned. DO NOT TAKE THE MASTER
KEY |
13
|
F.g.i.
|
-
3rd bullet: change 1st sentence: Owner is on leave and cannot be reached by telephone contacted.
|
13
|
G.c.
|
-
add to heading: Safe Isolation for Fluid Systems (excluding cryogens)
|
13
|
G.e.
|
-
change heading to read: 'Safe Isolation for Cyrogenic Liquids Systems
|
13
|
Appendix
2
Lockout/Tagout Checklist
|
-
number 1: add Notify all affected
employees that a lockout is required and the reason therefore.
Preparation for shutdown. Before an authorized or
affected
employee
turns off a machine or equipment, the authorized employee shall have
knowledge
of the type and magnitude of the energy, the hazards of the energy to
be
controlled, and the method or means to control the energy. Notify all affected employees that a
lockout is required and the reason therefore. |
13
|
Appendix
3
Specific Documented Procedures: JCMT
|
(Specific
Documented Procedures: JCMT): HMB
to redraft and consolidate castell key notes throughout this appendix. ACTION
53-2-04: HMB |
13
|
Appendix
3
C
|
-
change heading to read: Access to antenna Rx cabin and backing structure
for
routine
adjustments
and services |
13
|
Appendix
3
F.6.
|
-
change sentence to read: When the work is finished, inform the
TSS/WL, remove any clamps if
applicable, replace the
castell keys and any
clamps,
remove your name from the board, and verify that the
drives
are working normally. |
13
|
Appendix
3
J.1.
|
-
2nd sentence - change to read: If
possible, Establish two-way communication, for example, using
the telephone
system. |
13
|
Appendix
3
L.
|
change
heading and sentence to include tetrapod:
- 'Access to the SMU and Tetrapod for Major Work'
- '
This procedure applies to access to the SMU for removal from the
tetrapod and removal of the tetrapod,
via the overhead crane.'
|
13
|
Appendix
4
Specific Documented Procedures: UKIRT
A.2.
|
-
replace this section with text from Appendix 3, Section A2:
A. End of day checks after anyof these procedures
- If the TSS/WL on arrival finds that a lockout has been left
in
place but
the member of staff whose name appears on the lock has left, they shall
take the following action:
Try to contact the member of staff for permission to remove
the lockout. (Typically, in a vehicle or at HP.) If they confirm
that you may remove the lockout, do so. This will require the use of
side
cutters or even bolt cutters - do not do it lightly. - If you cannot
contact the member of staff, check to see if
the work appears
to be complete and that no obstructions have been left in the work
area.
Do not remove the lockout yet.
- Attempt to contact the Site Safety advisor, failing whom
the
Chief Engineer,
failing whom the Designated Official, for permission to remove the
lockout.
If none of them can be contacted, or if they are not able to verify
that
the lockout may be removed. It is recognized that this may well result
in loss of telescope time.
- If the TSS/WL finds that a lockout has been left in place
but
the member
of staff whose name appears against it has left, he shall take the
following
action:
- Try to contact the member of staff for permission to
remove
the
lockout.
(Typically, in a vehicle or at HP.) If they confirm that you may remove
the lockout, do so. This may require use of a bolt cutter and
safety
glasses.
- If you cannot contact the member of staff, check to see if
the work appears
to be complete and that no obstructions have been left in the work
area.
Do not remove the lockout yet.
- Attempt to contact the Site Safety Advisor, failing whom
the Chief Engineer,
failing whom the Designated Official, for permission to remove the
lockout.
If none of them can be contacted, then the lock may not be
removed.
It is recognized that this may well result in loss of telescope time.
- Make sure that the member of staff concerned is informed as
soon as possible
that the lockout was removed.
|
13
|
Appendix
4
B.3 & 4
|
-
reverse number order to correct sequence of procedure
|
13
|
Appendix
4
C.2 & 3
|
-
update and re-number this section as follows:
C. Telescope structure - minor
work
-
Lock out the telescope drive power as
follows: using the Castell
Key System (TD).
- use the castell key system (TD),
- use the multiple lockout
facility; DO
NOT
take the
master key (TD),
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
Note:
If required to do the work, you may remove
your castell key from the board and keep it on your
person.
DO NOT remove your name and date from the board until the work is
complete.
-
If
working on or above the mirror covers, also lock out the mirror covers
power (MC) (see Chapter 10,
Section
E 12 for access to the top of the mirror covers).
-
Verify, by attempting to operate the controls, that the
telescope drives,
and if applicable, the mirror cover drives, are disabled.
-
When the work is finished,
- replace the castell key (TD),
- replace the mirror cover castell key (MC) if applicable,
- verify that the power has been
restored,
- remove your name and date from
"lockout"
board,
- inform the TSS/WL that you have
finished.
|
13
|
Appendix
4
D.2, 3, & 4
|
-
update and re-number this section as follows:
D. Telescope structure - major
work
-
Lock out the telescope drive power as
follows: using the Castell
Key System (TD).
- use the castell key system (TD),
- use the multiple lockout
facility; DO
NOT
take the
master key (TD),
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
-
If working on or above the mirror
covers,
also lock
out the mirror covers power (MC) (see
Chapter 10, Section E 12 for access to the top of the mirror
covers).
-
Verify, by attempting to operate the controls, that the
telescope drives,
and if applicable, the mirror cover drives are disabled.
-
Attach the telescope tethers.
-
When the work is finished:
- remove the tethers,
- replace the castell key (TD),
- replace the mirror cover castell key (MC) if applicable,
- remove your name and date from
"lockout"
board,
- inform the TSS/WL that you have
finished.
|
13`
|
Appendix
4
E. 2, 3, & 4
|
-
update and re-number this section as follows:
E. Access to mirror covers
-
Lock out the telescope drive power as
follows: using the Castell Key
System (TD).
- use the castell key system (TD),
- use the multiple lockout facility; DO
NOT
take the
master key (TD),
- hang the key on the appropriate hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
-
Lock out the mirror covers power using the Castell
Key System (MC).
- use
the castell key system (MC),
- use
multiple lockout facility; DO NOT
take the master
key (MC),
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
- Verify, by attempting to operate the controls, that the
telescope and
the
mirror covers drives are disabled.
-
When work is finished:
- replace castell keys (MC) and (TD),
- verify the power has been restored to
both systems,
- remove your name and date from
"lockout"
board,
- inform the TSS/WL that you have
finished.
|
13
|
Appendix
4
G.2.
|
-
update and re-number this section as follows:
G. Dome Catwalk
-
Lock out the power to the dome as follows: using
the Castell Key System (DD).
- use the Castell
key system (DD),
- use the multiple
lockout facility, do not take the master key
(DD),
- Hang the key
on the appropriate hook on the "lockout" board
in the
Control
Room, write your name and date on the board.
-
If necessary, lock out either the 208V or 480V dome
power, or both depending upon which systems are to be worked on.
-
The
windblind
vertical bus duct on the right side shutter arch girder carries exposed
480V and so when working in this area the 480V dome power shall always
be locked out.
-
Verify, by attempting to operate the controls, that
the dome
drives
are disabled.
-
If any of the systems supplied by the 208V or 480V dome
power
were locked
out - verify, by attempting to operate the controls, that these systems
are disabled.
-
When work is finished:
- replace the Castell key (DD),
- if applicable, remove your lockout from either or
both
the 208V and
480V dome power,
- verify the power has been restored to the dome drives and
other
equipment,
- remove your name and date from "lockout" board,
- inform the TSS/WL that you have finished.
|
13
|
Appendix
4
H.4
|
-
add new number 4: use same text as section G.7.
- with additions to
be made by SCC (ACTION
53-2-05) add new bullet 3 :
turn local control switch(es) to AUTO or HAND as required,
H. Dome Catwalk - Dome
Ventilation Ssytem (DVS) / Weather Tight Enclosure (WTE) Manual
Operation
- When work is finished:
- replace the Castell key (DD),
- if applicable, remove your lockout from either or
both
the 208V and
480V dome power,
- turn local control switch(es) to AUTO or HAND as required,
- verify the power has been restored to the dome drives and
other
equipment,
- remove your name and date from "lockout" board,
- inform the TSS/WL that you have finished.
|
13
|
Appendix
4
I.
|
-
update and re-number this section as follows:
I. Dome Catwalk - Dome
Ventilation System (DVS) / Weather Tight Enclosure (WTE) Servicing
This procedure covers access to the catwalk to service,
maintain, or
repair the DVS system. Steps
are as for the procedures in (G) above
except
that, in addition, the
- Follow procedures in (G)
above.
-
DVS power shall be locked out using the DVS system circuit
breakers or
the dome 208V switch (see section B of
this
appendix).
- DVS motor circuit breaker: Panel DC breaker #8 isolates
power
to all
the
WTE motors. This breaker shall be locked out for maintenance and
repair
of the WTE's.
- DVS PLC circuit breaker: Panel DC breaker #14 isolates
power
to the PLC
electronics enclosures located on the catwalk to the left of the dome
shutter
(including control power to the WTE's). This breaker can be locked out
alone or in addition to #8 for electrical/electronics related
maintenance
and repair.
The
OFF position on the WTE local control station switch cannot be used to
lock out a WTE for maintenance or servicing as it is in the control
circuit and is not an acceptable energy isolating device.
-
Verify, by attempting to operate the controls, that the
power to
the
WTE motors is off and if applicable, to the DVS PLC electronics.
- When work is finished:
- remove lockout from 208V dome power switch or the panel DC
breakers #8
or #14,
- replace thae Castell key (DD) to restore dome drive power,
- verify the power has ben restored to the dome drives and
DVS
systems,
- remove your name and date from "lockout" board,
- inform the TSS/WL that you have finished.
|
13
|
Appendix
4
J.2
|
J. Dome Shutter
- change item #2 to read:
- Lock out the dome drive power as follows: using the Castell Key System (DD)
- use the castell key system (DD),
- use the multiple lockout facility; DO NOT take the master
key
(DD),
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
|
13
|
Appendix
4
K.2 & 3
|
-
change heading and items #2 & 3 to read:
I. Genie Articulating Boom Lift (access the Dome)
- Lock out the dome drives as follows: using the Castell Key System (DD).
- use the castell
key system (DD),
- use the multiple
lockout facility; DO NOT take the master key
(DD).
- hang the key on the appropriate hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
- Lock out the telescope drive power as follows: using the Castell Key System (TD).
- use the castell
key system (TD),
- use the multiple
lockout facility; DO NOT take the master key
(TD).
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
|
13
|
Appendix
4
L (new)
|
-
insert missing heading, change item #2, and re-alphabetize
- Genie Articulating Boom Lift (access the Telescope)
- Lock out the telescope drive power as follows: using the Castell Key System (TD).
- use the castell key system (TD),
- use the multiple lockout facility; DO NOT take the master
key
(TD).
- hang the key on the appropriate
hook on
the "lockout"
board in the Control Room, write your name and date on the board.
|
13
|
Appendix
4
M
|
- re-number and change new item #2 as follows:
M. Dome Drives
-
Inform the TSS/WL of your plans and make entry in the log
book.
-
Lock out the dome drives as follows: using the Castell Key System (DD).
- use the castell key system (DD),
- use the multiple lockout facility; DO NOT take the master
key
(DD),
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
-
Verify, by attempting to operate the controls, that the
power is off to
the dome drives and telescope drives.
-
When work is finished:
- replace the castell key (DD) to restore dome drive power,
- verify the power has been restored to the dome drives,
- remove your name and date from
"lockout"
board,
- inform the TSS/WL that you have finished.
|
13
|
Appendix
4
N.2 & 3
|
- change items #2 & 3 to read as follows:
N. Secondary Mirror Unit (SMU)
-
Lock out the mirror covers power as follows: using the Castell Key System (MC).
- use the castell key system (MC),
- use the multiple lockout facility; DO NOT take the master
key
(MC),
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
- Lock out the telescope drive power as follows: using the Castell Key System (TD).
- use the castell key system(TD),
- use the multiple lockout facility: DO NOT take the
master key
(TD).
- hang the key on the appropriate
hook
on
the "lockout"
board in the Control Room, write your name and date on the board.
|
Addendum
1
|
List
of Post Holders
|
-
change: Chairman of the Site Safety Committee from W. Light to S.Craig
- remove: Ed Lundin, Nick Rees, SPIFI and FTS groups from Authorised
Equipment Operators lists
- add: Chris Roberts to AzTEC Group (JCMT Rx Cabin Jib Hoist only) list
- add: Agency Staff as separate heading under All Jib Hoist (JCMT,
UKIRT & Hilo)
|
Addendum
2
|
Schedule
for Manual Review
|
-
update
|
Addendum
5
|
JAC
Safety summary sheet for visitors of less than 2-months duration
|
-
update Workshops section to read:
WORKSHOPS:
Stay out of the mechanical workshops at JCMT and UKIRT unless
explicitly
told you may enter by a JAC staff member. If you enter the JAC shops,
stay
within the yellow lines and follow the footwear policy noted in Chapter
8 Section A3a of the JAC Safety Manual. unless explicitly authorised
by a JAC staff member.
|
Addendum
7
|
Procedures
for Eye Exam Related to VDT Use
|
SCC to have ILM review and update
ACTION 53-2-06
|
Addendum
8
|
Mauna
Kea Vehicle Procedures Checklist
|
- 3rd bullet under
the heading "Vehicle Procedures": SCC to reword as there will be no
JCMT TSS on duty during the JCMT Shutdown. ACTION 54-1-05
- updated road
conditions email address
|
Addendum
9
|
Mauna
Kea Winter Logistics (MKSS doc)
|
-
replace with latest
copy received from MKSS
|
Addendum
11
|
Glossary
|
-
change definition of ' agency staff ':
agency staff: Staff
seconded by the international partner agencies of the JCMT. Effort hired through external agencies.
- add: PLC: Programmable Logic Control
|
Addendum
12
|
Evacuation
Maps
|
SCC to simplify
current maps to show
only evacuation routes. ACTION 53-2-09
|
Safety
Manual Phone #s
|
|
-
updated Chief engineer information
|
Back
cover
|
Important
Phone Numbers
|
-
added to Vehicles: F-350 Pickup
14 - 936-2966
- removed JAC Numbers: HP based Emergency Cellular Phone -
936-2966
|